Live-Fire Test and Evaluation (LFT&E)

FavoriteLoadingAdd to favorites

 

Live-Fire Test and Evaluation (LFT&E) is an assessment of the vulnerability and lethality of a system as it progresses through Developmental Test & Evaluation (DT&E) prior to Full-Rate Production (FRP). LFT&E typically includes testing at the component, subassembly, and subsystem level, and may also draw upon design analyses, modeling and simulation, combat data, and related sources such as analyses of safety and mishap data.

AcqNotes: Live-Fire Test & Evaluation Category

LFT&E is guided by a statutory requirement for “realistic survivability testing” or “realistic lethality testing” as defined in (10 USC 2366). A system can go thru Early and Full Up LFT&E.  One of the purposes of conducting LFT&E early in the program life cycle is to allow time to correct any design deficiency demonstrated by the test and evaluation.

LFT&E should accomplish the following:

  • Provide information to decision-makers on potential user casualties, vulnerabilities, and lethality, taking into equal consideration susceptibility to attack and combat performance of the system;
  • Ensure that knowledge of user casualties and system vulnerabilities or lethality is based on testing of the system under realistic combat conditions;
  • Allow any design deficiency identified by the testing and evaluation to be corrected in design or employment before proceeding beyond Low-Rate Initial Production (LRIP); and
  • Assess recoverability from battle damage and battle damage repair capabilities and issues.

Test & Evaluation Strategy
The LFT&E Strategy for a given system should be structured and scheduled so that any design changes resulting from the testing and analysis, described in the LFT&E Strategy, may be incorporated before proceeding beyond LRIP.

There are thee (3) specific types of DT&E are:

  1. Production Acceptance Test & Evaluation (PAT&E)
  2. Live-Fire Test & Evaluation (LFT&E)
  3. Product Qualification Testing (PGT)

AcqTips:

  • LFT&E has a statutory requirement to emphasize personnel survivability for covered systems occupied by U.S. personnel (10 USC 2366).
  • Covered system” is the DoD term that is intended to include all categories of systems or programs requiring LFT&E. – A “covered system” means a system that Director, Operational Test and Evaluation (DOT&E), acting for the Secretary of Defense, has designated for LFT&E oversight.
  • For a program deemed not o need LFT&E, a waiver package must be sent to the Congressional defense committees prior to Milestone B